Project Overview

The FlexRail™ Aisle Containment System is a new approach to achieving enhanced field safety while reducing cost and improving speed. A smart double slotted extrusion design allows for easy, intuitive assembly and flexibility in field configuration and sizing. Floor based assembly reduces lift time for improved life safety and minimizes 2-person operations for better Covid prevention.

Background

The FlexRail™ Aisle Containment System is a new approach to achieving enhanced field safety while reducing cost and improving speed. A smart double slotted extrusion design allows for easy, intuitive assembly and flexibility in field configuration and sizing. Floor based assembly reduces lift time for improved life safety and minimizes 2-person operations for better Covid prevention.

Challenge

The facility was supplying significantly more cooling than necessary, leading to energy waste and increased operational costs.​

Solution

Polargy implemented a Cold Aisle Containment strategy, which included:​

  • Installing PolarPlex™ Containment Panels to isolate cold aisles.​
  • Utilizing blanking sheets to seal empty rack units.
  • ​ Applying PolarDAM Air Dam Foam to block airflow under racks and seal gaps between rack sides and mounting rails.

Products Used

Results

  • Energy Savings: Achieved annual savings of 306,600 kWh, translating to approximately $30,000.​
  • Rapid ROI: Realized a payback period of just 3.7 months.​
  • Operational Efficiency: Decommissioned one CRAC unit and set two others to fan-only mode, reducing equipment wear and maintenance costs.
  • Temperature Stability: Reduced server inlet temperature variation from 20°F to 6°F, enhancing equipment reliability.​
  • Incentive: Secured a $9,350 rebate from PG&E for energy efficiency improvements.

Project

Floor based assembly minimizes overhead work. Light weight structure enables easy lifting of assembly into ceiling with hand crank jacks.

Minimal Two-Person Operations

Workers physically separated throughout the floor assembly and ceiling installation process. Single person on lift for ceiling attachment work.

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Aliquam sodales, dui quis ultrices ultrices, purus ipsum venenatis lorem, et auctor erat urna quis dolor. Sed at libero nibh. Proin id tristique ante.

John W

Chief People Officer, DELL

Drew Unger

VP OF SALES

Drew specializes in achieving growth targets and driving revenue through executive-level value creation. Having spent the majority of his career in the data center industry, Drew brings valuable expertise creatively solving problems in infrastructure and engineering cutting edge solutions to stay ahead of the changing technology landscape. Previously, Drew held leadership roles at Maysteel and Anixter.

Kristi O’Connor

VP OF FINANCE

As VP of Finance, Kristi oversees financial strategy and management for the Company. With a strong background in financial planning and analysis, she ensures sound fiscal operations. Kristi’s previous experience includes roles at DP Air Corporation and Clifton Larson Allen.

Brandt Weibezahn

CTO

Brandt has a proven track record in mechanical and industrial engineering. Skilled in negotiation, medical devices, and FMEA, he excels in product development and innovative solutions. Brandt’s career includes leadership roles at Devise Solutions, Fourte Design and Development, and Duel Systems, Inc.

Jan Bohlmann

COO

Jan brings extensive experience in strategic planning, process improvement, and operations leadership. As a Lean/Six Sigma Blackbelt, he drives efficiency and productivity through standardization and automation. Jan has successfully managed production expansions and led operational excellence at Remedi, Arrow Electronics, Skagen Designs, and Amazon.

Graham Leonard

CEO

Graham is a tenured leader with over 20 years of executive experience in the data center industry. With a customer-focused approach, Graham ensures project success by empowering his team to exceed expectations. Prior to Polargy, he held roles at AFCO Systems and Server Technology.